Loading...

St. John’s Quarter, Manchester

Project Overview

St. John’s Quarter represents a site of 10 hectares at the eastern portion of the city bounded by the River Irwell.

The area was named after St. John’s Church which was founded by a wealthy banker Lord Byron who also founded the first Quay (hence Quay Street) on the River Irwell.

The masterplan of the site developed by SimpsonHaugh Architects envisages a £1bn mixed use development, which will see offices, homes, retail and the “Factory” being delivered amidst the highest quality public realm, thus creating an exciting new quarter for enterprise, culture and living.

RoC Consulting were retained by Allied London to provide technical support to the St. John’s technical Masterplan.

A suite of utilities and services surveys was commissioned and following assessment of the data gathered critical infrastructure, and industrial heritage was identified. Certain elements of key infrastructure needed to be retained and maintained to allow phasing of development, which recognised existing uses, and income streams.

This initial appraisal, developed with the design team and Deloitte Planning Consultants, informed initial wider planning options. Of key importance was an understanding of site construction logistics where RoC Consulting made significant input.

Whilst the conclusion of all of these studies was the submission of a planning application we used the data gathered to prepare a “comprehensive” technical constraints plan for the entire site. This included the Flood Risk Assessment, negotiation of a free outfall discharge into the River Irwell and geo-environmental desk top studies. Thus gaining maximum value from the Planning Submission studies.

The technical constraints report, included plot specific constraint plans and encompassed archaeology and heritage considerations, drainage strategy, ground conditions, foundation solutions, utility diversions and a synopsis on further surveys/ investigations that would be required.

Challenges/Solutions

The scale of the proposed development, the interdependency of plot and servicing development through phasing required a systematic approach to information gathering and documentation. Each plot presents its own challenges including the structural assessment of the Salford Junction Canal, a heritage asset, crossing the site at depth.

Added Value

The data gathered was converted into a 3D revit model to facilitate services coordination, and briefing packs were produced for each plot to inform plot designers of constraints and mitigation strategies.

Project Details
Project St. John’s Quarter, Manchester
Discipline Civil Engineering
Client Allied London
Architect Simpson Haugh
Project Duration 2014 - 2018
Value £1bn Masterplan
Download Project
Previous Project
Office 3 St. Paul's Place, Sheffield
Next Project
Meols, Wirral
Our Values
  • Listen We ensure that we listen to what our clients say about their needs, objectives, programme, resources and budget.
  • Understand We make sure that we understand the client’s brief, undertake rigorous analysis and challenge all assumptions.
  • Innovate We design practical, innovative solutions to minimise cost without sacrificing quality, so that money is spent where it matters.
  • Create Working closely with the design team and contractors, we deliver the client’s vision on time and on budget.
  • Deliver Our approach ensures that our clients trust us and are confident in our ability to deliver.

RoC Consulting
Fourways House
3rd Floor
57 Hilton Street
Manchester
M1 2EJ

0161 214 5390 info@rocconsulting.com

RoC Consulting
Get Directions

CitiPark - Dale Street
Get Directions

CitiPark - Tariffi Street
Get Directions

NCP Car Park - Store Street
Get Directions